Mechanical Engineer for ALICE
Sök senast
Datum: 10 juli, 2026 Tid: 11:59
Placering: CERN
Mer information
The ALICE Technical Coordination team is expanding to address the increased mechanical-engineering workload associated with the scheduled Large Hadron Collider (LHC) Long Shutdown periods in 2026-2028 (LS3) and 2033-2034 (LS4), including detector decommissioning and installation activities, the development of the entirely new ALICE 3 detector, and the preparation of future detector infrastructure.
As a Mechanical Engineer, you will contribute to the execution of LS3 installation activities and the design and construction of the ALICE 3 detector system, working within a multidisciplinary team of engineers, technicians, and designers.